The two-phase Boiler Replacement Projects at Kaiser Fontana included installation of four 600 hp Johnston Boilers and an Industrial Steam Deaerator


Representative Building Systems

KAISER INLAND EMPIRE
1505 Edgemont Mechanical/Electrical Upgrade

ANAHEIM MEMORIAL HOSPITAL
Emergency Power Addition

SAINT JUDE HOSPITAL
Chiller Plant

KAISER INLAND EMPIRE
Boiler Replacement

TARZANA REGIONAL MEDICAL CENTER
Chiller Plant Upgrade

KAISER INLAND EMPIRE
Chilled Water Upgrade

ORTHOPAEDIC HOSPITAL
Chiller & Cooling Tower Replacement

CITY OF HOPE
Chemical Waste Handling Area

CITY OF HOPE
Hazardous Waste Building

The Hamilton Construction staff has the engineering expertise and project experience to make your Building Systems project a success. This expertise along with our commitment to detailed planning of construction sequencing produces the success these critical projects demand.

Our Boiler Replacement Project at Kaiser Fontana Medical Center was a two phase replacement of the existing boiler plant to include a new Industrial Steam Deaerator and four new 600 horsepower Johnston Boilers. The smooth implementation and level of quality exhibited in the final product reflect the level of commitment and involvement by the team members from Kaiser Permanente, SFA Engineers, Intelisyn Project Management,Ware & Malcomb Architects, and Hamilton Construction.

Similar successes on projects such as the Cogeneration Facility at the City of Hope National Medical Center, Orthopaedic Hospital Chiller and Cooling Tower Replacement, and Tarzana Regional Medical Center Central Plant Upgrade reflect our commitment to the pre-planning, detailed sequencing, and contingency planning required to make these types of project a success.

The 1505 Edgemont HVAC/Electrical Upgrade Project and Kaiser’s Los Angeles Medical Center included construction and of a new DWP Transformer Building and rooftop mounted Central Air Handler, Chillers, and Reheat Boiler which replaced the existing mechanical and electrical services in their entirety.